Custom Development Software Process
Navigation: Testing> Configuration Management

Pre-Condition:

- Completed Functional & Systems Testing
- All reported bugs are fixed

 

Activities:

Task Name PIC Template Standard/Procedure Guideline/Process
Update Package/Installer Technical Lead      
Create Patches Technical Lead      
Patch Installation Procedure Technical Lead      
Create appropriate tags for documents and source code Technical Lead     SVN Practice Guideline
Continuous update to SVN Technical Lead, Technical      
Update Project Generation Document Technical Lead Project Generation Template    
Update the Version Control document Functional Lead, Technical Lead Version Control Template    

 

Post-Condition:

- Tag for Beta Release is created
- Package/Installer for Beta Release is updated
- Backup of repository and other material is created