Custom Development Software Process
Navigation: Design> QA

Pre-Condition:

- Design is 85% completed

 

Guideline/Process Flow :

Activities:

Task Name PIC Template Standard/Procedure Guideline/Process
Conduct Technical QA QA Engineer Technical QA Report Template    
Conduct Project QA QA Engineer Project QA Report Template    

 

Post-Condition:

- Technical design of the project is reviewed
- Project healthiness, Guideline/Process, and deliverables is checked